Biochar traceability: from farm to factory to carbon sink
JISL Logo
JISL Biochar Portal
Central Access to the Internal DMRV Tool, Survey Intake, Biomass QC, Dashboard Review, Lab Processing, Biomass Prediction, Gasifier Telemetry, Plant EHS and Production & Dispatch.

Internal DMRV Portal

End-to-end digital MRV and visibility across the biochar value chain — from feedstock procured to biochar produced, dispatched and applied as a carbon sink.

  • Feedstock procured & biochar produced tracking
  • Summaries by feedstock type with weighted averages
  • Biochar dispatched data & sink application records
  • Sink pipeline visibility

Feedstock Survey

Field-facing farmer & feedstock survey app with a separate admin dashboard for records and delivery.

  • New survey, drafts & completed submissions
  • Bulk PDF downloads by date range
  • Admin: records, users & delivery management

Biomass QC

QC inspection app, dashboard and lab module for end-to-end biomass quality checks.

  • Guided 4-step QC inspection with photo capture
  • Dashboard: date summary, entries review & downloads
  • Lab: pending uploads, complete queue & reports

Biomass Prediction Tool

Decision-support platform that scores biomass health and predicts biochar suitability & carbon credit before pyrolysis.

  • Estimates Probable Carbon Credit from lab results
  • Configurable thresholds, formulas & alerts
  • Health dashboards with reports & audit logs
Coming Soon

Gasifier - Telemetry

Live PLC dashboard streaming real-time sensor data from the pyrolysis gasifier.

  • Real-time readings direct from the gasifier PLC
  • Temperature, pressure & flow monitoring
  • Passcode-protected internal access

Biochar Plant EHS

Environment, Health & Safety portal for the Biochar Plant — live PPE compliance, work permits, incidents and AI-flagged monitoring at a glance.

  • Daily, weekly & monthly PPE compliance & days-since-LTI
  • Work permits, incidents & CAPA tracking
  • Monitoring registers with AI anomaly alerts (noise, illumination)
  • Safety rounds, internal audits, waste & EHS trainings

Biochar Production & Dispatch

Plant-floor module tracking each bag from production through quality and dispatch into TC Park shop-floor processing.

  • Production entry by date, material & gassifier — one row per bag produced
  • Quality stage: composite moisture % applied batch-wide to compute Dry Wt.
  • Dispatch stage: tick bags individually or by range against a batch
  • TC Park shop floor: Biochar GRN, Pre Mixing, Mixing & spillage collection
  • Consolidated register — one row per Serial No. with Google Sheet export
  • Stock registers for Biochar & TC Park